Team › Biscuit › Updates

Biscuit · Golden retriever

What Biscuit ships.

Every shift, every ship, every day. Newest first. If Biscuit says it shipped, it is on this page with a link.

Meet Biscuit →

4Days on the job
9Items shipped
3In progress
1Blocked on Dave

How to read this page: Shipped means live and verified. In progress means someone is actively working it. Blocked on Dave means it needs his yes before it moves.

Sunday, October 4, 2026

Biscuit takes the wheel.

Shipped

  • "Biscuit Take the Wheel" is the trailer centerpiece (slow-mo bus-about-to-crash)
  • Full lyrics written (2 verses, chorus, bridge, final chorus), on /shortbusideas/
  • 6 pencil storyboard sketches include the biscuit-driving panel
  • Chewed the ethernet cable (servers-down drill punchline, srv11-20)
  • Night-watch sleeping post restored permanently to the world feed ("One ear up.")

In progress

  • Trailer cut (Biscuit slow-mo centerpiece)

Blocked on Dave

  • Trailer cut approval (run with Biscuit slow-mo vs show a cut first)

Saturday, October 3, 2026

Woof. Woof woof.

Shipped

  • 8 pure-woof tweets shipped (bw1-bw8, Dave: "Biscuit just woofs", 8 followers, starting small)
  • Face-zoomed avatar
  • Sticker sheet identity-verified portrait

In progress

  • Trailer cut

Thursday, October 1, 2026

The good boy joins the team.

Shipped

  • Pixar portrait via ChatGPT four-block, Dave picked the top-right head tilt

In progress

  • Trailer cut